| CLIENT NAME | PROJECT NAME | SIZE | MATERIAL | STANDARD |
|---|---|---|---|---|
| Sinopec Zhenhai Refining & Chemical Company | 1000000MT ethylene project | 325*10 273*7 406*10 |
Gr.B 20 |
ASTM-A106 GB/T8163-2008 |
| BASF-YPC Company Limited | ethylene project | 406*9.5 273*9.27 |
Gr.B 20 |
GB/T8163-2008 ASTM-A106 |
| BASF-Shanghai | Polyurethane project | 168.3*7.11 219.1*8.18 273.1*9.27 |
Gr.B 20 |
ASTM-A106 |
| Shanghai SECCO Petrochemical Company Limited | Ethylene project | 237*7 | 20 | GB/T8163-2008 |
| Dushanzi Petrochemical Company | Reformation of Refinery and ethylene technology | 219*7 168*7 168*6.5 325*8 |
20 | GB/T8163-2008 |
| CNPC Lanzhou Branch | ethylene project | 57*4 108*5 325*10 273*7 |
20 | GB/T8163-2008 |
| SINOPEC | The Hainan refinery projec | 325*8.5 508*13 114*6 273*9.5 |
20 | GB/T8163-2008 |
| Fujian Refining & Petrochemical Company Limited (FREP) | Integrated project | 89*8 108*6 168*7 325*10 356*8 356*11 273*6.5 |
20 20G |
GB/T8163-2008 GB3087-2008 GB9948-2000 GB5310-2008 |
| CNPC | Guangxi Qinzhou project | 114*4.5 168*5.5 114*6 356*8 219*6.5 |
20 | GB/T8163-2008 |
| CNOOC | Huizhou refinery project | 457*9.5 356*9.5 406*9 273*9.5 325*10 273*13 273*6.5 |
20 15CrMoG Cr5Mo |
GB/T8163-2008 GB3087-2008 |
| SINOPEC Maoming | ethylene project | 60.3*3.91 88.9*5.49 219.1*8.18 168.3*7.11 273.1*9.27 219.1*127 325*12 273*12 219*7 273*8 |
Gr.B 20G20 |
ASTM-A106 GB5310-2008 GB/T8163-2008 GB3087-2008 |
| SINOPEC | The Qingdao refinery project | 273*9.5 89*5.5 168*7 325*8 219*6.5 356*8 273*6.5 219*8 273*8 273*10 325*10 |
20 15CrMoG 16Mn |
GB/T8163-2008 GB9948-2006 GB3087-2008 GB5310-2008 |
| SINOPEC | Tianjin ethylene project | 273*8 168*7 219*10 219*12 273*14 |
15CrMoG 20 |
GB/T8163-2008 GB5310-2008 |
| Odfjell-Jiangyin | Chemical storage | 219*6.5 | 20 | GB/T8163-2008 |
| Jiangsu Senda Group | Senda thermoelectric | 20 | GB/T8163-2008 | |
| Huaneng Suzhou Thermal Power Plant | 100000 kW 2 generating units | 377*30 277*22 219*20 |
12Cr1MoV 20G |
CNB-9 GB5310-2008 GB/T8163-2008 |
| Yanshan Hongrun Piping Group Co., Ltd. Hebei | 60000 kW 2 generating units | 323.9*20 273*28 377*20 |
12Cr1MoV 20G |
CNB-9 GB5310-2008 |
| Changzhou Huaneng Power | 50000 kW 2 generating units | 273*28 273*30 | 10CrMo910 20G |
DIN17175 GB5310-2008 |
| Jinan Hifetec Internarional Trading Co.,Ltd | 135000 kw 1 Units | 273*28 377*28 377*20 |
12Cr1MoV 20G |
GB5310-2008 CNB-9 |
| Liaoning Fuxin Pressure Vessel | 200000 kw unit | 406.4*30 406.4*45 406.4*40 |
12Cr1MoV 10CrMo910 |
DIN17175 GB5310-95 CNB-9 |
| Wuxi Xinfeng Pipe | 200000 kw unit matching the hot section of pipeline | 457.2*23.5 406.4*25 | 10CrMo910 P11 |
DIN17175 ASTM A335 |
| HYUNDAI Heavy Industries | Steam Boiler | 355.6*40 377*30 273*32 |
10CrMo910 P22、20G |
DIN17175 ASTM A335 CNB-9 GB5310-2008 |
| Hebei Canghai Pipe Co., Ltd. | Pipe and fittings manufacturing | 273*25 373*30 325*32 |
12Cr1MoV 20G |
CNB-9 GB5310-2008 |
| Liaoning Fuxin Electric Equipment Manufacturing Co., Ltd. | Pipe manufacturing and pipe fittings | 273*28 426*14 426*16 |
12Cr1MoV | CNB-9 GB5310-2008 |
| China Power Investment Corporation(xi'an) | 300000 kW generating set | 323.9*34 325*32 |
12Cr1MoV | CNB-9 GB5310-2008 |
| The construction of three companies Shuangliang Project Department | the Second-period project Styrene | 168*7 114*6 219*8 89*5.5 |
20 | GB/T8163-2008 |
| TeckGuan (china) Ltd | Thermal power engineering | 219*6 273*8 108*4 76*4 |
20 | GB/T8163-2008 |
| Nanjing Chemical Construction Co., Ltd | Dafeng Engineering project | 377*11 480*9 325*12 273*8 |
20 | GB/T8163-2008 |
| China Tianchen Engineering Corporation | Shenhua coal products project | 168*6.5 219*6.5 406*9.5 |
20 | GB/T8163-2008 |
| Jiangsu Desai Chemical Fiber Co. Ltd. | Polyurethane project | 20*10 720*8 630*8 168*6 219*6 219*9 |
Q235B 20 |
SY/T5037-2000 GB/T8163-2008 |
| KURVERS Pipeline Trading (Shanghai) Company Limited | Dow Corning Project | 168.3*7.11 219.1*8.18 88.9*5.49 114.3*6.02 |
20 | ASTM-A106 ASTM-A53 |
| Jiangsu Huayang pipe&fittings Co., Ltd. | Chemical pipe Transmission and distribution | 219*8 114*6 88.9*5.49 73*5.16 |
Gr.B 20 |
GB/T8163-2008 ASTM-A106 |
Contact Us
Changjiang Steel Pipe will look forward to working with friends from all walks of life with better quality products and more considerate services.
Create brilliance together!
Copyright © 2021 Jiangyin City Changjiang Steel Pipe Co., Ltd., . All rights reserved. 苏ICP备05023228号 Powered by 300.cn
Whatsapp
E-mail
Tel